Section 23-2-121When newly constructed tunnel or bridge deemed part of existing facility.
Should the density of traffic on the interstate highway system require the construction, as a part of the interstate highway system, of another tunnel or bridge parallel with, and in close proximity to, a then existing toll facility which has been incorporated into the interstate system, then the newly constructed tunnel or bridge shall be considered as a part of the original facility, and tolls shall be allowed to be collected on the newly constructed facility to pay the costs of operation and maintenance and for the retirement of the debt existing on the toll facility.
(Acts 1957, No. 450, p. 612, §2.)
|